Skip to content
Loading Events
  • This event has passed.

Event

All Events »

Stepping Thru – Circulation Paths, Accessible Routes, & Path of Travel

Date:
October 26, 2018
Time:
10:00 am - 3:30 pm
Location:
CA
Host:
AIA Long Beach / South Bay

5.0 LU/HSW 

AIA Members $150
Non-AIA Members $200

This seminar qualifies for 2019 California License Renewal

Description

Accessible Routes, Circulation Paths, & Path of Travel  in both new and existing projects are essential aspects of Accessible design – if you cannot even get to an area, no matter how accessible that portion is, it will still not be accessible. Overview routes from the public right of way, to site amenities, to the entry, and thru the building including egress and existing building requirements.


Summary

An overview of the differences between and requirements for Circulation Paths, Accessible Routes, and Path of Travel from the public way, thru the site, to the entry, thru the building, and to the exits.


Learning Objectives

  • Understand the differences between Circulation Paths, Accessible Routes, and Path of Travel.
  • Review the scoping and technical requirements for each on both the exterior and interior.
  • Learn about the connectivity of elements, entries, floors, and exits and what is required.
  • Overview Path of Travel requirements for existing projects and alterations.

Registration

More Information and Registration »